Robe River Mining – Western Australia

agsdi-people

Customer:

Robe River Mining Co

agsdi-location

Location:

West Angeles Mine, WA

agsdi-gear

Product:

Prilled Ammonium Nitrate

Requirements of Robe River Mining

Sinclair Knight Mertz engaged Kerman Contracting Pty. Ltd. to design and construct a storage facility for prilled ammonium nitrate. A conveyor was required to transfer the product from bottom or rear dump trucks to the storage shed. The conveyor had to:

  • be able to handle a prilled product up a slope of 15°
  • be manufactured from stainless steel because of the corrosive nature of the material
  • be able to convey the material without degradation.

Technical Information

  • Conveyors: 1
  • Belt Width: 800 mm
  • Length: 33.55 m
  • Inclination: 15°
  • Capacity: 300 tph
  • Belt Speed: 2.8 m/s
  • Drive Power: 18.5 kW
  • Fan Power: 1.5 kW
  • Product Density: 0.72 T/m³

Aerobelt Solution

Aerobelt Australia provided an all stainless steel conveyor that was fed from a purpose designed gang valve installed beneath the feed chute to provide a uniform feed rate.

Ammonium Nitrate Conveyor Robe Rover Mining
Conveyor Ammonium Nitrate
Ammonium Nitrate Aerobelt

More Aerobelt Customer Projects

Ready to enhance your materials handling? Discover the Aerobelt difference

Contact Us