Robe River Mining – Western Australia

agsdi-people

Customer:

Robe River Mining Co

agsdi-location

Location:

West Angeles Mine, WA

agsdi-gear

Product:

Prilled Ammonium Nitrate

Requirements of Robe River Mining

Sinclair Knight Mertz engaged Kerman Contracting Pty. Ltd. to design and construct a storage facility for prilled ammonium nitrate. A conveyor was required to transfer the product from bottom or rear dump trucks to the storage shed. The conveyor had to:

  • be able to handle a prilled product up a slope of 15°
  • be manufactured from stainless steel because of the corrosive nature of the material
  • be able to convey the material without degradation.

Technical Information

  • Conveyors: 1
  • Belt Width: 800 mm
  • Length: 33.55 m
  • Inclination: 15°
  • Capacity: 300 tph
  • Belt Speed: 2.8 m/s
  • Drive Power: 18.5 kW
  • Fan Power: 1.5 kW
  • Product Density: 0.72 T/m³

Aerobelt Solution

Aerobelt Australia provided an all stainless steel conveyor that was fed from a purpose designed gang valve installed beneath the feed chute to provide a uniform feed rate.

Ammonium Nitrate Conveyor Robe Rover Mining
Conveyor Ammonium Nitrate
Ammonium Nitrate Aerobelt

More Aerobelt Customer Projects

Kennedy Rice Mill – Louisana

Kennedy Rice Mill – Louisana

Aerobelt partnered with Kennedy Rice Mill to design custom conveyors connecting 14 silos, ensuring seamless integration, dust-free transport, and reduced operational costs.

read more

Ready to enhance your materials handling? Discover the Aerobelt difference

Contact Us